Adams County is scheduled to close CR 900 North between US 27 and Winchester Road beginning Friday March 27th for up to 14 days for partial deck patching and joint repairs at the ends of the bridge. The bridge will be CLOSED to thru traffic for the duration of the project. Barricades will be offset at the ends of the roadway to allow local traffic to enter.
Residents are encouraged to use the Bridges on CR 350W near Wyneken school and the US 27 bridge to Winchester Road to cross the river. A formal detour route will not be posted as part of the project.


